
Indefinite Delivery Indefinite Quantity (IDIQ)
GreenTech shall provide complete architectural/engineering works and construction activities services at various Government facilities worldwide including but not
Regional Military Training Center (RMTC) consisted of the construction for completion of the Afghanistan National Army Regional Military Training Center (RMTC) adjacent to the Corps Support Battalion (CSB) at Camp Hero, Kandahar Province, Afghanistan.
Regional Military Training Center (RMTC) consisted of the construction for completion of the Afghanistan National Army Regional Military Training Center (RMTC) adjacent to the Corps Support Battalion (CSB) at Camp Hero, Kandahar Province, Afghanistan.
This project consisted of the specified site-adaptation, site design, infrastructure design, and construction of a partially constructed for the campus facility which will house approximately 3,000 personnel consisting of trainees and staff.
Site Master planning was utilized from the 35% submission with changes to the WWTP and Substation areas. Force protection consists of perimeter fence, an anti-vehicle ditch, and a stone wall. Anti Terrorist/Force Protection (ATFP) setbacks for buildings from interior roadways have not been incorporated.
The original Design-Build project for the RMTC has been partially Constructed. OHG as the prime contractor of this DESIGN-BID-BUILD for this project supplied all material, provided labor and equipment to complete this project.
Effluent Requirements

GreenTech shall provide complete architectural/engineering works and construction activities services at various Government facilities worldwide including but not

The project is defined as the design, material, labor, and equipment to construct buildings, facilities, utilities and other infrastructure for the new plant; modify sewer collection system to re-route wastewater flow from the existing plant to the new plant; and restore existing plant site.

The nature of this project was Waste water treatment of “ANA BRIGADE FACILITIES-JALAL ABAD AFGAHNISTAN” that was designed in according with the influent quantity and quality of waste water and effluent criteria. The selected system for the treatment is chosen as pond.
25214 LARKS TER, CHANTILLY, VA, 20152
571-337-1358
info@gt-usa.com
WhatsApp us