
Indefinite Delivery Indefinite Quantity (IDIQ)
GreenTech shall provide complete architectural/engineering works and construction activities services at various Government facilities worldwide including but not
The work includes a new centralized wastewater treatment system including new gravity sanitary sewer mains and branches, lift stations, force mains, manholes, waste water treatment plant sludge filter press and an effluent disposal system.
The work includes a new centralized wastewater treatment system including new gravity sanitary sewer mains and branches, lift stations, force mains, manholes, waste water treatment plant sludge filter press and an effluent disposal system.
A 500 gallon tank was constructed adjacent to the effluent disposal outfall to capture treated waste water. A submersible pump provides water to yard hydrant for plant water wash down and tanker fill after sand filtration.
Sanitary Sewer
The existing sanitary sewer system consists of 25 septic / holding tanks scattered throughout the compound. It required that all the sanitary sewers connect into a central wastewater treatment plant.
Effluent Requirements
Sewer Collection Type: sewer gravity

GreenTech shall provide complete architectural/engineering works and construction activities services at various Government facilities worldwide including but not

The project is defined as the design, material, labor, and equipment to construct buildings, facilities, utilities and other infrastructure for the new plant; modify sewer collection system to re-route wastewater flow from the existing plant to the new plant; and restore existing plant site.

The nature of this project was Waste water treatment of “ANA BRIGADE FACILITIES-JALAL ABAD AFGAHNISTAN” that was designed in according with the influent quantity and quality of waste water and effluent criteria. The selected system for the treatment is chosen as pond.
25214 LARKS TER, CHANTILLY, VA, 20152
571-337-1358
info@gt-usa.com
WhatsApp us