Indefinite Delivery Indefinite Quantity (IDIQ)
GreenTech shall provide complete architectural/engineering works and construction activities services at various Government facilities worldwide including but not
The nature of this project was Waste water treatment of “ANA BRIGADE FACILITIES-JALAL ABAD AFGAHNISTAN” that was designed in according with the influent quantity and quality of waste water and effluent criteria. The selected system for the treatment is chosen as pond.
The nature of this project was Waste water treatment of “ANA BRIGADE FACILITIES-JALAL ABAD AFGAHNISTAN” that was designed in according with the influent quantity and quality of waste water and effluent criteria. The selected system for the treatment is chosen as pond. As per scope of work, this system is designed for 9000 people and this system used water 155 Liters per Capita per Day. Influent BOD and influent TSS for this system was considered as200 mg/l. as the total sewage flow (average flow rate was 1116 M3/day.
Design and Construction of a Wastewater Treatment Plant to include:

GreenTech shall provide complete architectural/engineering works and construction activities services at various Government facilities worldwide including but not

The project is defined as the design, material, labor, and equipment to construct buildings, facilities, utilities and other infrastructure for the new plant; modify sewer collection system to re-route wastewater flow from the existing plant to the new plant; and restore existing plant site.

The nature of this project was Waste water treatment of “ANA BRIGADE FACILITIES-JALAL ABAD AFGAHNISTAN” that was designed in according with the influent quantity and quality of waste water and effluent criteria. The selected system for the treatment is chosen as pond.