Client: USAID – United States Agency for International Development
Contract Number: 72066822C00005
Contract Period: 2022 – 2024
Location: Juba, South Sudan
GreenTech USA LLC participated in the development and installation of wastewater treatment infrastructure serving USAID facilities in Juba, South Sudan. The project included engineering support, procurement, and installation of wastewater treatment equipment and associated infrastructure.
The system included wastewater collection components, treatment units, pump stations, and supporting electrical and control systems required for reliable wastewater treatment operations.
GreenTech provided technical services including equipment installation oversight, system commissioning support, and operational readiness assistance to ensure proper system performance and compliance with environmental standards.
The project improved wastewater treatment capacity and environmental management for critical facilities in Juba.